BDX were engaged by Link Alliance to design and fabricate a heavy duty structural steel seal ring which is an integral part of the tunnel boring operation on Auckland’s City Rail Link. The 8m diameter ring was fabricated from rolled 300PFC channel and had to be within 2mm tolerance overall to ensure the tunnel boring machine ‘Dame Whina Cooper’ could safely break through out of the rock and into the station.
Having BDX by your side opens the door to a world of knowledge, creativity, and accuracy.
We are dedicated to working closely with you to learn about your specific requirements, so that the final result fully reflects your vision. Your next project is more than just another assignment- it's an engineering challenge, and with BDX, trust us to go above and beyond to make things happen.
Made with ❤️ by 1768degrees.com. Helping Entrepreneurs Grow.
Built on Aotearoaweb.com.
2023 BDX Engineering. All Rights Reserved.